VVS Sheveron Stadium | Verona, NY
Smith Site Development was chosen to renovate the Multi-Purpose Athletic Facility at Vernon Verona Sherrill Schools. The project included new Sod Soccer Field, new Multi-Function Track & Field plus new Multi-Use year-round Synthetic Turf Field.
Scope of Work:
Erosion Control Measures
Demo Existing Fields & Track
Remove existing Topsoil & Stockpile
Install Underground Drainage
Install Stormwater Retention Areas
Install Concrete Trench Drain
Install Fields & Track Subbases
Install Rubberized Track
Install New access Roadways & Parking Lots
Install New Bleacher System, Press Boxes and Concession Stand
Install New Synthetic Multipurpose Turf Field
New Field Events Steeplechase, Triple Jump, & Pole Vault Areas
Install Concrete and asphalt walkways
Landscaping
Fence and Gates
Top Soil and Seed walkways
ADA Stripping