Newark Valley Central School District

Smith Site Development was chosen by Newark Valley Central Schools to transform and recreate aging and inefficient parking lots and roadways into a  transportation  safe  environment for Students, Staff and Visitors alike. It included removing all old failing storm drains, full box out of asphalt subbase, replacing full depth subbase & heavy duty asphalt including proper stripping. Plus enhancements and upgrades to Baseball field.

  • Installed Heavy Duty and Light Duty Coarse Asphalt

  • Installed Finish  Asphalt an Stripping

  • Installed Concrete Walkways and entrances

  • Installed Baseball Field Fencing, Backstop, warning track,

    and proper drainage

Scope of Work:

  • Erosion Control and Strip Top Soil

  • Clearing, grubbing  and full depth milling of all paved surfaces 149,000 SF

  • Removal of concrete Bumpers and Curbing

  • Full box out of Subbase Material

  • Removal of Storm Water Structures and Piping

  • Installed New Storm Drainage Systems

  • Replaced  Heavy Duty Subbase throughout

  • Installed New Concrete Curbing

Previous
Previous

Utica Charging Station EV

Next
Next

Owego Apalachin Transportation Facility