Canpack - Project Thunder | Scranton, PA

The Canpack Distribution Center, consisted of a complete building demolition and  reconstruction. Smith Site Development was appointed to complete the Civil Site portion of this 70 acre project.

  • Underground Utilities

    • Storm Water

    • Sanitary Sewer

    • Fire Loop

    • Domestic Water

    • Site Electrical

  • Install Building Pad & Paving Subbase Material

  • Install Retaining Walls

  • Install Dolly Pads

Scope of Work:

  • Erosion Control Measures

  • Demolition of Existing Structures

  • Clearing, Grubbing, Milling

  • Install Retention Ponds

  • Mass Excavation – 71,978 Cubic Yards

  • Prep for 1,100,000 Sq Ft Building Pad

Install 2,020 LF Loading Dock Concrete Aprons

  • Install Concrete Curbs & Sidewalk

  • Asphalt Parking Lots & ADA Striping

    • 3.5 acres Employee

    • 8,000 LF Driving Lane

    • Highway Turning Lanes

  • Finish Grading

    • Place Topsoil  &  Seed/Mulch

    • Landscaping  &  Fencing