Crown Cork and Seal Production Facility | Nichols, NY
Smith Site Development was chosen for the Crown Cork and Seal Production Facility as the Civil Site contractor. This is a 500,000 sq.ft. facility on 39 acres.
Scope of Work:
Erosion Control Measures
Clearing & Grubbing
Install Retention Ponds
Mass Excavation - 142,150 Cubic Yards
Underground Utilities
Storm Water
Sanitary Sewer
Fire Loop
Domestic Water
Site Electrical
Site Natural Gas
Install Subbase Materials
500,000 sq.ft. Building Pad
Loading Dock Aprons
4,000 LF of Driving Lanes
Concrete and Asphalt Parking Areas
Install Concrete Curb & Sidewalks
Install Retaining Walls
Install Concrete and Asphalt Driving Lanes
Screen & Place Topsoil
Seed/Mulch/Landscape/Fencing & Gates